I’m finally building my dream water cooled editing PC with quick disconnects. This has been a rig I’ve been planning since 2019 and it is finally coming together!

Thermaltake TOUGHRAM RGB: https://www.thermaltake.com/products/memory.html

BECOME A MEMBER: http://grsk.co/ytjoin
FLOATPLANE: http://grsk.co/floatplane
DISCORD COMMUNITY: http://grsk.co/community
PATREON: http://grsk.co/patreon
MERCH STORE: http://grsk.co/store

Some Cameras & Gear Used To Make These Videos
?Panasonic Lumix GH5
http://amzn.to/2mNQAfr

?Fujifilm X-T2 – http://amzn.to/2DyjQ1f
http://amzn.to/2DyjQ1f

?Panasonic 12-35mm f/2.8 II
http://amzn.to/2oriBVW

?Metabones SpeedBooster EF – MFT 0.71x
http://amzn.to/2twAF4H

?RodeLink FM Wireless Filmmaker System
http://amzn.to/2yKuI6b

We earn commission from any purchases made with the Amazon Affiliate Links.

Chapters

0:00 – Intro
0:44 – Some Of The Special Parts
1:56 – We Test Fit Everything First
2:56 – Thermaltake TOUGHRAM RGB AD
3:35 – Why Am I Building This?
4:18 – Radiator Orientation
5:00 – Time To Reverse The Test Fitting
5:33 – Hidden Pump Res Combo
6:47 – EK Pro Manifold
7:45 – How Do The Quick Disconnects Work
9:16 – Using Passthroughs To Hide Plumbing
10:20 – Reminder To Tighten All Your Fittings
10:56 – Loop Flow Direction and Radiator Alignment
12:31 – Connecting The Radiators To each other
12:54 – Removing Everything
13:13 – Flush Your New Radiators
15:40 – Fill Port
16:35 – Removing The Mid Plate
17:22 – Lets Get Started
20:13 – The Test Fitting Is Complete

#watercooled #workstation #beast

source